The Pallet Shuttle is a high-density storage system with a motorized shuttle that runs along the rails inside the storage channel. This system can be optimized for both LIFO and FIFO operations and since it requires minimal height and depth clearance it permits high-density storage.
Utilizing a WiFi-connected tablet the operator simply issues a command to the shuttle for load and unloading of merchandise.
Decrease The Risk Of Accidents
There are many safety features and advantages of pallet shuttle systems that make it one of the most efficient high-density systems to load and unload pallets quickly, safely and accurately.
Operation is quick and easy to use offering management safety features like prohibiting unauthorized personnel to operate the shuttle. The built-in position sensors in the system help position the loads and since the forklift does not need to enter the lanes, the risk of accidents caused by the collision of material handling equipment is greatly reduced.
Advantages
Reduced loading/unloading times
Save space by storing deeper and higher with minimal clearance required.
During the site visit we identify what the objectives are for the project. Our team will arrive in the appropriate gear, get dimensions, thoroughly check the building and review our findings with you, the client.
STEP 2:
Proposal submittal
Utilizing the discoveries collected during the site visit, your assigned sales rep will work with the team to configure a plan that will best serve your needs. We will then submit the project proposal for review.
STEP 3:
CONTRACT EXECUTION
Once the contract is signed, our team gets to work! We specialize in the design, submittal and approval of Building & High Pile Plans.
STEP 4:
Permit approval & Material delivery
Our team coordinates material delivery to align with permit approval to ensure we are ready to begin installation upon getting permits approved.
STEP 5:
Installation
Our installation team is licensed, bonded and insured. With a Project Manger, an Install Manager and a Head Foreman, on site, we guarantee your project will be properly executed from start to finish.
STEP 6:
Inspection by the city & Client sign off
After installation is complete, we coordinate inspection and final walk through. If all is approved the appropriate department signs off on the project.