Pallet Flow Racks fully utilize available storage space allowing up to 4 pallets to be stocked in one track. Installed in a sloping lane, this system is ideal for first-in, first-out (FIFO) inventory management. Pallets then safely glide safely and effortlessly at a controlled rate to the front of the storage lane.
KEEP PICKING AISLES FILLED
Pallets are loaded at the highest end of the roller track and move by gravity to the other end, where they are picked. As a pallet is picked the pallet behind moves down the slope into position and is ready to be picked next. This system ensures that the picking position is always filled and extraction is always possible.
Advantages
Optimal rotation of products with expiration dates
Various configurations available for a customized and most efficient system design
During the site visit we identify what the objectives are for the project. Our team will arrive in the appropriate gear, get dimensions, thoroughly check the building and review our findings with you, the client.
STEP 2:
Proposal submittal
Utilizing the discoveries collected during the site visit, your assigned sales rep will work with the team to configure a plan that will best serve your needs. We will then submit the project proposal for review.
STEP 3:
Proposal submittal
Once the contract is signed, our team gets to work! We specialize in the design, submittal and approval of Building & High Pile Plans.
STEP 4:
Permit approval & Material delivery
Our team coordinates material delivery to align with permit approval to ensure we are ready to begin installation upon getting permits approved.
STEP 5:
Installation
Our installation team is licensed, bonded and insured. With a Project Manger, an Install Manager and a Head Foreman, on site, we guarantee your project will be properly executed from start to finish.
STEP 6:
Inspection by the city & Client sign off
After installation is complete, we coordinate inspection and final walk through. If all is approved the appropriate department signs off on the project.